Working closley with the client Fore Partnership and Palmer & Harvey to produce a new store layout design to achieve a modern convenience store.

To achieve the new design we removed and disposed of a redundant fortress Post Office counter system so that we could increase the retail area.

Works Carried Out:

Close liason with central networks to organise a new 3 Phase electrical supply to the store so that we could meet the elctrical demands from the new remote refrigeration cabinets.

Stripping out and disposal of all redundant shelving and display equipment.

Organising the re-location of an existing ATM cash machine.

Installation of 8m of new remote  refrigeration upright frozen food cabinets.

Installation of new metal modular shelving.

Fitting of both beech finished and mirrored finished plain and Slatwall cladding to all exposed walls and pillars.

Fitting an aluminium faced with blue bull nose pelmet to the entire perimeter of the store to meet the Mace (Palmer & Harvey) specification.