Works Carried Out:
Installation of a new powder coated aluminium DDA compliant shopfront.
Re-cladding the tired shopfront exterior with new brickslips.
Installation of a new pocelain tiled floor to the main reatil area with a plush red carpet tile to the greeting card area.
Fire-lining the ceiling and installing a new suspended ceiling with bespoke lighting fittings to enhance the colours in the magazines and confectionery.
Design & Installationn of a new air conditioning system.
A complete electrical re-wire and the istallation of a new fire alarm and security system.
Istallation of new metal modular shelving system.
Installation of a 16m long illuminated Bartuf News & Magazine display with a bespoke television display.
Installation of new greeting card display units with mirrored acrylic Slatwall to give a modern upto date feel to the area.
Fitting new Pewter and Mirrored plain and slatted cladding to all exposed walls and pillars.